Bassbob
Emissary
Man, this stuff was a lot easier a couple years ago. About 3 years ago I poured 6 piers, using 87 80lb bags of concrete in a weekend and didn't break a sweat. And they were big piers, in roots, dug 4' deep. You can see those piers under my shop in two of these photos. Yesterday and today I dug and poured 6 piers 36" deep and it whooped my ass. 30 bags of concrete, no Sonotube, no rebar. Just belled out at the bottom per usual.